FOUNDATION
• RCC Pile and Pile Cap Raft
SUPERSTRUCTURE
• Framed structure as per relevant IS Codes
WALLS
• External Wall – Lightweight AAC blocks or equivalent
• Common Walls – Lightweight AAC blocks or equivalent
Windows / Glazing (Facade)
• Combination of Cladding / Paint Louvers / Glazing (as per the architect’s scheme)
DOORS
• Staircases – Fire Resistant Door
• Common Toilets – Flush Door
• Oces – as per specication by the project architect
• Retail Spaces – as per specication by the project architect
WATER-PROOFING
• As per specication by the project architect / consultant
ULTIMATE ROOF
• Façade Access System
• Solar - Power System
• Lightning Arrester
• Aviation Lighting
• Staircase Mumty
• Lift Machine Room
• Overhead Water Tanks
ELECTRICAL POWER SUPPLY
• Oce & Retail Areas – Electrical Wiring – 3 Phases up to the main DB
• Common Areas – as per the consultant scheme
POWER BACK-UP
• Full DG Back-up
AIR CONDITIONING
• Common Areas
• Oce & Retail Spaces
• Restaurant / Kitchen
(Note: Only the high side would be provided by the promoter and the low side to be executed by the allottee at his own cost. Operating charges as per BTU meter or as per sq.ft. basis for normal operation hours)